Learn how to Adjust the Master Valve (MV) to Zone Delay in SmartLink Network by following the instructions below
Step 1: Log In and Select Your Controller
- Go to smartlinknetwork.com and enter your login credentials to access your account.
- On the Site Page, find the search bar and type in and select your Site Name from the search results.
- Then click on the Controller name
-OR- - Locate the Controller List at the top, then find and click the Controller name.
Step 2: Access the Advanced Menu
- Navigate to the Advanced Programming / Menu tab on the Controller Page.
Step 3: Adjust the Master Valve to Zone Delay
- Find the Master Valve to Zone Delay setting.
- Understand that this setting allows the master valve to open before the zone valves to pressurize the main line while keeping all inactive zone valves closed.
- Adjust the delay time to your preference or set it to 0 seconds for the master valve and zone valve to open at the same time.
- We recommend keeping the factory default setting of 2 seconds.
Step 4: Save and Send Changes
- After making your adjustments, click Save Advanced Settings.
- Click Send to apply the changes to your controller.
- Confirm that your updates were sent successfully by checking for a green Successfully Sent banner.
Still Need Help?
If you have any questions, please email us at support@weathermatic.com or call us at 888-484-3776.
Thank you!
https://app.snapcall.io/weathermatic
Comments
0 comments
Article is closed for comments.