Learn how to adjust the number of Start Times on your SmartLine controller in SmartLink Network using the instructions provided below
Step 1: Log In and Select Your Controller
- Go to smartlinknetwork.com and enter your login credentials to access your account.
- On the Site Page, find the search bar and type in and select your Site Name from the search results.
- Then click on the Controller name
-OR- - Locate the Controller List at the top, then find and click the Controller name.
Step 2: Adjust the Number of Start Times
- From the Controller Page, scroll down and click on the Advanced Menu link underneath Flow.
- Locate the option for Max Concurrent Programs.
- Adjust the number of start times from the default setting of 3 to 4, 5, 6, 7, or even 8 start times, depending on your needs.
Step 3: Save and Send the changes to your SmartLine Panel
- Click Save at the bottom of Advanced Settings
- At the top of SmartLink, a red Send button will appear. Click that
- Wait a few moments for the changes to send your panel. A green Successfully Sent banner will appear afterwards
- If a Red Failed to Send banner appears, wait 1 minute and try to Send again
Why Adjust Start Times?
- Optimize Watering Efficiency: Manually manipulate run soaks to reduce water runoff.
- Prevent Runoff: Set shorter cycles, allowing water to soak into the soil before restarting the irrigation cycle.
- Restrict Start Times: Limit to one start time if concerned about unintended or errant program starts.
- Staggered Start Times: Reduce electrical surges by staggering zone start times.
Still Need Help?
If you have any questions, please email us at support@weathermatic.com or call us at 888-484-3776.
Thank you!
https://app.snapcall.io/weathermatic
Comments
0 comments
Article is closed for comments.