Learn how to set program start times in SmartLink Network by following the instructions below
Step 1: Log In and Select Your Controller
- Go to smartlinknetwork.com and enter your login credentials to access your account.
- On the Site Page, find the search bar and type in and select your Site Name from the search results.
- Then click on the Controller name
-OR- - Locate the Controller List at the top, then find and click the Controller name.
Step 2: Access the Programming Tab
- On the Controller Page, navigate to the Programming tab.
- Select the irrigation program you want to edit, such as Program A, B, C, or D.
- Click Edit Program to access the settings.
Step 3: Set Program Start Times
- Locate the Start Time section within the program settings.
- Each program can have multiple start times, allowing for multiple irrigation cycles per day if needed.
- To add a new start time:
- Select the desired time from the drop down menu.
- To remove a start time:
- Select Off from the drop down menu.
- Ensure the AM or PM selection is accurate.
- Once satisfied with your changes, click Save.
Step 4: Send Changes to Your Controller
- After saving, click the Send button to apply the updated schedule to your controller.
- The communication process may take a few minutes.
- A green Successfully Sent banner will appear when the update is complete.
Still Need Help?
If you have any questions, please email us at support@weathermatic.com or call us at 888-484-3776.
Thank you!
https://app.snapcall.io/weathermatic
Comments
0 comments
Article is closed for comments.